World of Concrete 2027 / Booth N1373

Booth visit

Estimating

Your standards,
on every bid.

Set up assemblies, labor groups, budget codes and phases once. Every estimate starts from how your company works.

PLAT estimate for Harbor Point Warehouse, Budget tab: phase totals above the Footings phase and its line items

AI powered

Just ask.
And it answers.

PLAT Intelligence lives inside every estimate and across the whole app. Ask about a line item, a total or a job, and it answers from your own records.

Ask PLAT tab on the Harbor Point Warehouse estimate: a question box searching 6,009 passages, with common questions such as “What’s the freezer slab mix”
Sources

Every answer cited

Each line links back to the sheet or spec page it came from.

Specs

Ask the spec book

Mix designs, cure times and vapor barriers, in seconds.

Scope

Who carries what

Find testing, demo and cleanup language before you price it.

History

Chats stay on the job

Earlier questions save to the estimate for the whole team.

Highlights

Assemblies.

Build an item once, reuse it every bid.

Labor groups.

Your crews and rates, ready on every estimate.

Budget codes.

Mapped to the codes your accounting already uses.

Phases.

Every budget starts with your standard layout.

Assemblies

Set it up once.
Use it every bid.

Build a footing, slab or panel once with its concrete, rebar, forms and labor. Drop it into any estimate and it’s priced.

  • Materials

    PSI, slump and dollars per yard.

  • Labor groups

    Your crews and their rates.

  • Budget codes and phases

    Coded the way your accounting reads it.

Footing F1 2’x1’

Per LF · 24 × 12 in

Footings
  • Concrete, 3000 PSI 0.074 CY
  • Rebar, 3-#5 continuous 3.00 LF
  • Forms, both sides 2.00 SF
  • Footing crew 0.08 MH

+2 more items

Per linear foot

$17.52 / LF

Drop it in

Harbor Point Warehouse

Footings phase

Item

Qty

Total

Footing F1 2’x1’

318 LF

$5,569.77

Pad footing F2 3’x3’

6 EA

$562.48

Pad footing F3 4’x4’

4 EA

$570.39

Quantity from takeoff, price from the assembly

Proposals

From estimate
to proposal.

Pick a layout, add your logo and brand color, and build the proposal section by section from the estimate. Snippets keep scope, inclusions and exclusions in your words.

Sleek proposal layout for Red Mesa Concrete Co.: a white page with the logo at the top, above the cost summary
Sleek
Banner proposal layout for Red Mesa Concrete Co.: an orange brand-color band across the top, above the cost summary
Banner
Ledger proposal layout for Red Mesa Concrete Co.: a framed header and a boxed contract sum, above the cost summary
Ledger
Sidebar proposal layout for Red Mesa Concrete Co.: company and project details in an orange side column, above the cost summary
Sidebar
Layouts

Multiple layouts

Sleek, Banner, Ledger or Sidebar. Pick the one new proposals start from.

Brand

Your logo and color

Light and dark logo versions and your brand color on every page.

Sections

From the estimate

Details, scope, inclusions, exclusions and final text, one section at a time.

Pricing

Cost summary

Building, on-site and off-site totals, with the amount written out in words.

FAQ

Questions, answered.

Straight answers about Estimating. Anything else, we will walk you through it on a call.

Yes. Set up your assemblies, labor groups, budget codes, phases and mix designs once, and every estimate starts from them.